METHOD STATEMENT // SAFE SYSTEM OF WORK // RIGGING SUPERVISOR
Nominate the single person in charge of the lifting operation, the designated signalman, and all competent personnel directly involved in the lift.
| # | Name | Role / Designation | Qualification / Cert. | Responsibility |
|---|---|---|---|---|
| 01 | ||||
| 02 | ||||
| 03 |
This section captures the technical basis of the lift. Use actual approved weights, exact radii, and confirmed lift points rather than estimates wherever possible.
| Equipment / Gear | Capacity / Rating | Cert. / Inspection Ref. | Qty | Condition / Color Code |
|---|---|---|---|---|
No lifting starts until permit, lift plan, certificates, ground condition, and crew briefing are confirmed by the rigging supervisor.
No boom-up, slew, or travel after rigging unless the trial lift confirms balance, stability, correct radius, and clear communication.
Stop immediately on loss of communication, wind exceedance, chart margin concern, unauthorized entry, load shift, or ground settlement.
| Hazard | Risk Level | Control Measure | Responsible |
|---|---|---|---|
Required PPE
Pre-lift verification
For complex, critical, or tandem lifts, include the lifting engineer / appointed person or other competent approver required by site procedure.